十大正规网赌软件

埃克斯坦中学

东北75街3003号.
西雅图,华盛顿州98115
关于Eckstein
办公时间:早上8点.m. - 4 p.m.
星期三:早上8点.m. - 3 p.m.
办公电话:206-252-5010
传真:206-252-5011

埃克斯坦学校简介

就读地区 考勤区地图

学校领导和董事会地区

Eckstein的社区合作伙伴 Community resources and programs at 埃克斯坦中学


学校持续改善计划(C-SIP)

Eckstein中学C-SIP

The 学校持续改善计划(C-SIP) is an action plan for each school that identifies the areas a school plans to focus on in the current and coming school year, the performance goals they want students to achieve, and how the school plans to collaboratively meet these goals.

The plans are updated regularly to reflect the strategies being used at each school. This document also serves as the school-wide improvement plan for our Title I schools.


学校及楼宇报告

学校报告

埃克斯坦中学报告

学校报告s show a brief snapshot of a school’s academic growth, 学生气候, 问责制, 家庭和员工敬业度, 以及学校的整体表现. School reports are produced by the State Office of Superintendent of Public Instruction for each school and district in the state and updated periodically throughout the year as data becomes available.

关于国家评估, students who are expected to participate but do not, 比如缺席或选择退出, 被算作非精通. This may affect the school’s overall proficiency rating.

Questions 十大正规网赌软件报告? 联系研究与评估部门 research@actorinla.com.

学校气候调查

埃克斯坦中学气候调查

学校气候调查s are used for school-level improvements, 所有员工都要接受气候调查, 学生和家庭. The staff and student surveys are given to respective groups in person at schools; the family survey occurs in the spring.

建筑历史

Eckstein建筑历史和信息

埃克斯坦被指定为西雅图的地标. 没有指定报告. 查看西雅图地标上市.gov.

石棉危险紧急反应法(AHERA)

Surveillance of known asbestos in the Eckstein building is performed every six months by a designated person to assess the condition of the Asbestos Containing Building Materials (ACBM). Six-month assessment results are maintained by the district.

根据AHERA的要求, 埃克斯坦中学 must maintain an Asbestos Management Plan (AMP) and keep it on file at the school. The AMP is available for review during school hours, Monday through Friday. 如需更多资料,请联络:

温迪时装
环境健康和安全经理
wjcouture@actorinla.com
206-252-0528


纪律仪表板

作为西雅图卓越计划的一部分, 十大正规网赌软件战略计划, the district is committed to interrupting disproportionate practices in discipline. To support this work and to increase transparency and 问责制, the district has created and published public facing discipline dashboards for each school which became available on November 1, 2021.

Discipline dashboard data reflects the current school year and will be updated quarterly throughout the school year. For questions or concerns, please reach out to the school leader for a specific school.

学年:当前学年.
访问/违约: Click here to switch to an accessible version of the dashboard.
按月行动: Count of disciplinary actions by month and exclusion type.
Actions: Count of disciplinary actions for an exclusion type.
Attribute: Student Attribute (gender, race/ethnicity, special education served, 504 plan)
Days:排除天数 for an exclusion type.
排斥日:排除天数.
纪律率: Count of students with at least one disciplinary incident divided by count of all enrolled students.
E. Expulsions: Count of emergency expulsions for a student attribute.
Enrolled:在校生总数.
排外行动:排他行为的计数 for a student attribute.
排除天:排除天数 for a student attribute.
排除类型:短期停牌(SS), 长期停飞(LS), 紧急驱逐(EE), 在校休学(IS), 驱逐(特异), 及临时替代教育环境(IA).
排他的行动:排他行为的计数.
Expulsions:学生属性的开除次数.
FERPA合规: Family Educational Rights and Privacy Act Compliance. *
按星期划分的事件:按星期计算的纪律处分次数.
按级别划分的事故:按年级划分的纪律处分次数.
按小时划分的事故:按小时计算的纪律处分次数.
按排除类别划分的事故:违纪事件数 for an exclusion type.
Incidents by Student Attribute or Support Service:违纪事件数. Incidents are counted as many times as there are students involved.
每100名学生的事件数:违纪事件数 divided by enrolled students and then multiplied by 100. Incidents are counted as many times as there are students involved.
Rate:排除类型的惩戒率.
学校的名字:学校名称.
Students: Count of students with at least one disciplinary incident.
Suspensions: Count of suspensions for a student attribute.
Weapons:违纪事件数 in which a weapon was involved.

* Please note: When a group has fewer than 10 enrolled students, all values for at least the two smallest groups are suppressed.

Eckstein Levy项目

BTA III

2010年2月, the $270M, 六年基建征费, Buildings, 科技及学术III (btaiii), 获得73人支持.45 percent of those voting in the levy election. 这是对建筑物的更新, 技术和体育(BTA II)税, 于2004年2月由选民通过.

  • 2016 : Upgraded fire sprinklers; phase II.
  • 2015 :更换天窗. 已安装灭火系统. Made improvements to heating, hot water lines and plumbing fixtures.
  • 2013 : Replaced old heating controls with programmable electronic controls and made associated improvements.
  • 2012 : Made modifications to Special Education classroom.

BTA II

In 2004, Seattle voters approved the BTA II capital levy. The levy funded nearly 700 facility improvement projects and technology upgrades at every school in the district. 

  • 2011 :安装了新的节能健身房照明设备.
  • 2010 :更换屋顶.
  • 2009 : Complete replacement of the boiler plant and steam trap. 两个新的科学实验室,安装了新的管道, 新电, 新型低压和新型排气系统. 一楼走廊瓷砖更换.
  • 2008 :运动场升级
  • 2006 :外墙玻璃砖
  • 2005 :重新装修,电源升级,健身房升级,艺术 & 科学技术

BTA I

价值1.5亿美元的建筑, Technology and Academics/Athletics (BTA I) capital levy was approved by voters in February 1998. BTA I funded more than 465 small and large facility projects at every school in the city. The projects included safety and security upgrades, roof and window replacements and technology and athletic field upgrades.

  • 2000 :重新装修,电源升级,健身房升级,艺术 & 科学技术
  • 1999 :更换健身房运动计分板

About BTA

这些建筑, Technology and Academics (BTA) Capital levy supports the district’s long-range plans to upgrade and renovate aging school facilities and address enrollment growth.

The BTA IV Capital levy was approved by voters in 2016. 十大正规网赌软件 will receive these levy funds from 2017 through 2022.

在Eckstein注册